OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Asbestos Brake Lining, Trailer Hitches, Trailer Mudguard, We have ISO 9001 Certification and qualified this product .over 16 years experiences in manufacturing and designing, so our products featured with best quality and competitive price. Welcome cooperation with us!
OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP Detail:

Quick Details

Place of Origin: FOSHAN, China (Mainland)
Brand Name: MBPAP
Model Number: 460 / 560
Application: tank truck
Material: steel
Dimensions: 16” / 20”
Standard or Nonstandard: Standard
Pressure resistance: 0.254MPA
Emergency open pressure: 21KPA-32KPA
Connect way: Flange
Temperature range: -20 to 70 °C
Style: Mechanical Seal

carbon steel manhole cover (1)

Specification

Whole diameter 16”/ 20”
Nominal diameter 10”
Emergency open pressure 21KPa ~32Kpa
Max emergency flow rate 7000m³/h (When 34KPa )
Material Carbon steel
Temperature range -20 ~+70 ℃

Benefit and Features:
When the tanker truck is in high temperature condition, the manhole will automatically exhaust the air inside to release the pressure, ensuring the safety of the tanker.

With P/V Vent inside:
When there is pressure differences inside and outside the tanker, it will automatically inlet or exhaust air to adjust the pressure so that it can ensure the safety and environmental protection.

Secondary Open Design:
When open the up binder plate, it will release the pressure out to prevent the workers from pushing over.

Blinding Holes Design:
In the main plate of the Manhole, there are three binding holes can be installed with Vapor Valve, Optic Sensor, Dip Tube or Outer Vacuum Valve according to the user’s demand.

Packaging & Delivery

packaging: carton, pallet & wooden case as per customer’s request.

Delivery time: within 15 days after payment

Fatigue and fall test

Drum Type Axle (2)

Drum Type Axle (2)

FAQ

Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.

Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We’ll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.

Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.


Product detail pictures:

OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer  – MBP detail pictures

OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer  – MBP detail pictures

OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer  – MBP detail pictures

OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer  – MBP detail pictures


Related Product Guide:

No matter new customer or previous client, We believe in prolonged time period and trustworthy relationship for OEM/ODM Supplier Biggest Truck In The World - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP , The product will supply to all over the world, such as: Zambia, Congo, Leicester, We've been consistently broadening the market within Romania in addition to preparation punching in extra premium quality merchandise connected with printer on t shirt so that you can Romania. Most people firmly believe we've the whole capacity to provide you happy solutions.
  • This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Agustin from Romania - 2018.06.05 13:10
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By ron gravatt from Canberra - 2017.04.28 15:45
    Write your message here and send it to us