Leading Manufacturer for Fuel Truck - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking to your belief of "Creating solutions of high quality and generating buddies with people from all around the world", we always put the fascination of customers to start with for Mercedes Actros, Plastic Trailer Mudguards, Elite Trailers, "Making the Products of High Quality" is the eternal goal of our company. We make unremitting efforts to realize the goal of "We Will Always Keep in Pace with the Time".
Leading Manufacturer for Fuel Truck - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP Detail:

Quick Details

Place of Origin: FOSHAN, China (Mainland)
Brand Name: MBPAP
Model Number: 460 / 560
Application: tank truck
Material: steel
Dimensions: 16” / 20”
Standard or Nonstandard: Standard
Pressure resistance: 0.254MPA
Emergency open pressure: 21KPA-32KPA
Connect way: Flange
Temperature range: -20 to 70 °C
Style: Mechanical Seal

Use for: Bulk tank trailer and fuel tank trailer

carbon steel manhole cover (1)

Specification

Whole diameter 16”/ 20”
Nominal diameter 10”
Emergency open pressure 21KPa ~32Kpa
Max emergency flow rate 7000m³/h (When 34KPa )
Material Carbon steel
Temperature range -20 ~+70 ℃

Benefit and Features:
When the tanker truck is in high temperature condition, the manhole will automatically exhaust the air inside to release the pressure, ensuring the safety of the tanker.

With P/V Vent inside:
When there is pressure differences inside and outside the tanker, it will automatically inlet or exhaust air to adjust the pressure so that it can ensure the safety and environmental protection.

Secondary Open Design:
When open the up binder plate, it will release the pressure out to prevent the workers from pushing over.

Blinding Holes Design:
In the main plate of the Manhole, there are three binding holes can be installed with Vapor Valve, Optic Sensor, Dip Tube or Outer Vacuum Valve according to the user’s demand.

Packaging & Delivery

packaging: carton, pallet & wooden case as per customer’s request.

Delivery time: within 15 days after payment

Fatigue and fall test

Drum Type Axle (2)

Drum Type Axle (2)

FAQ

Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.

Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We’ll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.

Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.


Product detail pictures:


Related Product Guide:

Like a result of ours specialty and repair consciousness, our enterprise has won a superb popularity amid buyers everywhere in the environment for Leading Manufacturer for Fuel Truck - Cheap price Carbon steel 16”/20” manhole cover for fuel tank trailer – MBP , The product will supply to all over the world, such as: Peru, Czech, South Korea, Providing Quality Products, Excellent Service, Competitive Prices and Prompt Delivery. Our products are selling well both in domestic and foreign markets. Our company is trying to be one important suppliers in China.
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
5 Stars By Elma from Canberra - 2018.09.21 11:01
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
5 Stars By June from Iceland - 2017.06.22 12:49
Write your message here and send it to us