Specifications
30 cubic meter three axle reinforced dump semi-trailer: load 60 tons,
Length width height 10950 * 2480 * 3625,
Empty size 10100 * 2308 * 1300mm,
Chassis: upper wing plate 20 * 140, lower wing plate 20 * 140, web 8,
Beam height 500, box bottom beam 20 # channel steel, box bottom plate 10 and side plate 5 are 700L high-strength steel plate,
Details
One 40HQ is equipped with one semi-trailer dump truck
Hyva fc-191-5-7325 hydraulic lifting system (excluding power take-off),
Traction plate 10mm,
90 # traction pin,
Fuhua 19” legs,
16 ton MBP axle,
Fuhua heavy three-axis suspension, with 10 pieces of 90 * 16 leaf springs,
12r22.5 tire, 13 sets of 9.0-22.5 steel rings,
2 WABCO pneumatic control valves, 6 full dual chambers, 2 air reservoirs,
Standard configuration of electric circuit, 24 V seven core socket,
1 toolbox, 1 spare tire, and bottom with booster Strong stabilizer.
FAQ
Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.
Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We’ll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.
Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.